Design • Measure • Estimate • Plan the build
Add each device using its actual dimensions from the manufacturer. Shelf and bay sizes feed into the preliminary frame and MDF take-offs. Airflow and access clearances must be checked against each device's instructions.
Frame layout and cut list are coordinated conceptually, but still require verification of actual connections, loads, wall fixings and appliance clearances before construction.